Final Inspection (Presure Test) & Painting
- Tyre inflation pre-set at 2, 4 & 8 bar (max) for a better QC inspection.
- Enclosed by steel cage as safety protection.
- Testing cycle ended automatically to reduce supervision work.
- Well lighted within the cage for better visual inspection.
The retreaded tyre is subjected to a final inspection. This
inspection insures that only tyres that meet industry quality standards
are allowed to leave the retread plant.
All retreaded tyres are encouraged to be returned with the sidewalls painted using a light coat of black tyre paint
All retreaded tyres are encouraged to be returned with the sidewalls painted using a light coat of black tyre paint
Admin tidak bertanggung jawab atas semua isi komentar ,Mohon dipahami semua isi komentar dengan bijak